Homeowner bought a home EV charger.
Installed the customer-supplied car charger.
From our job records · Aug 2024
Level 2 charging at home — installed, permitted, and load-calculated so your panel never complains.
EV charger installs in Houghton and Juanita's older homes typically require a load calculation first, while newer Moss Bay condos usually have more panel capacity to work with.
We size every system to your actual demand — not a one-size guess. Here's what a typical EV charger install includes:
| Output | Up to 48 amps |
|---|---|
| Range/hr | Up to 46 miles |
| Network | Wi-Fi & smart scheduling |
| Connector | J1772 / NACS |
Houghton, Juanita and Finn Hill still have original and fuse-based panels in many mid-century homes. Older Kirkland panels often can't take a 50-amp EV circuit without changes. We do a load calculation first and use a load-sharing charger or a panel upgrade when needed.
A new 240-volt charger circuit is permitted electrical work. Kirkland runs its own electrical permit and inspection program, so permits for this work go through the City of Kirkland rather than Washington L&I (L&I list of cities). We pull the permit and meet the inspector.
Electric service in Kirkland is provided by PSE. For panel, meter and service work we schedule the disconnect and reconnect with the utility for you.
Our job records show more than 500 completed jobs for Kirkland customers across ZIP codes 98034, 98033. We take EV charger installation calls in Houghton, Juanita, Finn Hill, Rose Hill, Totem Lake, Moss Bay and the rest of Kirkland.
3-year charger warranty, 2-year workmanship, and free smart-schedule setup.
Book this serviceInstalled the customer-supplied car charger.
From our job records · Aug 2024
Pulled from our own job log. No customer names, addresses, or contact info shown, by design.
Kirkland runs its own electrical permit and inspection program, so permits for this work go through the City of Kirkland rather than Washington L&I. For EV charger installation, we apply for the permit, book the inspection, meet the inspector on site, and give you the final sign-off for your records.
Yes. A Level 2 charger needs an electrical permit, which in Kirkland comes from the City of Kirkland. We pull the permit and schedule the inspection.
Our job records show more than 500 completed jobs for Kirkland customers across ZIP codes 98034, 98033. We take EV charger installation calls in Houghton, Juanita, Finn Hill, Rose Hill, Totem Lake, Moss Bay and the rest of Kirkland. Call (425) 615-5000 for same-day service.
A full rewire with modern, code-compliant circuits throughout the home.
Learn morePower out, breaker won't reset, or something's sparking? Same-day emergency electricians, day or night.
Learn more